Locking the brewhouse

12 posts / 0 new
Last post
JamesLewis
JamesLewis's picture
Offline
Last seen: 1 year 3 months ago
Locking the brewhouse

I stopped in tonight and the door was not locked properly. The combination was still set to the open number so it was not locked. The last person out probably thought they locked it but did not do it properly. The combination needs to be set to anything other than the unlocking combination.

We cant have this happen, there is too much expensive stuff in there. Please double check the lock when you leave.

IGZ
IGZ's picture
Offline
Last seen: 7 years 11 months ago
Alchemist, member since
exterior lights need to be

exterior lights need to be tuned off, as well.  we need to write up a little checklist on the inside door.

...igz...

lagerdan
lagerdan's picture
Offline
Last seen: 9 years 11 months ago
Apprentice, member since
yeah...i saw chuck mac at the

yeah...i saw chuck mac at the brewhouse the other day and he said the gas was still turned on....i agree with iggy..check list is needed

IGZ
IGZ's picture
Offline
Last seen: 7 years 11 months ago
Alchemist, member since
 

making a checklist now.  anything that needs to be added?

 

Please make sure all equipment is cleaned and put away.
                       
Please make sure floor is swept and mopped.
                       
Please make sure fermentation room is closed.
                       
Please make sure ALL gas valves are turned off.
                       
Please make sure the heat is turned off.
                       
Please make sure that interior and exterior lights are off
                       
Please make sure the sink in cleaned.
                       
Please make sure that the bathroom and main door are locked.
                       
Please make sure to keep brewing awesome beer.

...igz...

JamesLewis
JamesLewis's picture
Offline
Last seen: 1 year 3 months ago
water off

water off

JamesLewis
JamesLewis's picture
Offline
Last seen: 1 year 3 months ago
Can it be a big sign on the

Can it be a big sign on the door?

IGZ
IGZ's picture
Offline
Last seen: 7 years 11 months ago
Alchemist, member since
i only have capability to

i only have capability to print 8.5x11.

i can send you the spreadsheet if you have a plotter at your architecture firm...

...igz...

JamesLewis
JamesLewis's picture
Offline
Last seen: 1 year 3 months ago
I can do color 11x17 if you

I can do color 11x17 if you can make the file.

JimChochola
JimChochola's picture
Offline
Last seen: 3 years 1 day ago
I hate that you can't add

I hate that you can't add files to these threads.

 

I've come up with some additional signage and a "template" you guys can use for the doors. I will send it via regular e-mail.

IGZ
IGZ's picture
Offline
Last seen: 7 years 11 months ago
Alchemist, member since
i made it simple in black and

i made it simple in black and white.  you should have received it via email.

...igz...

JimChochola
JimChochola's picture
Offline
Last seen: 3 years 1 day ago
Call me a dumbass but I don't

Call me a dumbass but I don't remember talk about half the stuff listed above, esp. "changing the combination" of the door. Furthermore, I thought at the new place we *didn't* have to turn off the gas at the main line (just the wall and burner).

Additionally, I couldn't figure out how to shut off the back light over the storage shelves.

Definitely need not only to explain *to do* these things but also *where/how*.

JamesLewis
JamesLewis's picture
Offline
Last seen: 1 year 3 months ago
That is because this thread

That is because this thread relates to the old brewhouse not the new. 

I am not sure we have made a good proceedures manual for the new yet.